Lynn has made great progress on the house over the last several weeks. Most of the internal infrastructure (plumbing, electrical, support structure) is complete and now the final structural elements are coming into place before the face of the house will start looking much more modern. The stairs on the right lead to the second floor of the house from the sidewalk. There will be a sister set of stairs to the to the left that will lead to the first floor of the house from the sidewalks. Most of the openings in the front of the house that are not blocked in will be windows. Notice, there will be no balcony on this (the street) side of the house which adds quite a bit of extra internal space.