Mark kicked off a lot more work today on the kitchen. He found a place to position the propane tank, roughed in the plumbing for the kitchen and got the hardwood floor guy going. Tomorrow, the electrician will start. I think there must be two phases of these things. My sense is that their is additional electrical and plumbing things to do after the cabinets are in and to prepare for the appliances. Mark said the final Swedish finish goes on the floor at the very end so the only thing that happens right now is the installation of the living room floor and the sanding that needs to be done. I am wondering when the window in this photo is removed and replaced with a door. All that, I think, has to be completed before the cabinets can be installed.
In the meantime, there was a wind storm in Centralia that blew over a tree that might or might not (maybe Bob and Gena have an opinion–they sent us the picture) on our property. The trees are dense enough there that probably most of the trees close to our property are somewhat protected.