Lorena thinks she wants a the new house to be yellow. She likes something a little bit on the brighter side of pastel. We have to pick the exterior colors for the house by Monday so our new friend, Larry the house designer, can present them to the Granbury Historic Preservation Commission. God willing, the process has started. My understanding of the way it works is that, as soon as the plans are approved, the construction drawings can start. When the construction drawings are complete, two processes that both take about a month will kick off in parallel. Engineering drawings for the foundation and all adjustments needed for that will start. In addition, a very rigorous costing of the house will be formulated so we will know how much money is needed. There will be a big meeting at the end of that process with spreadsheet in hand to determine what kind of trade-offs are needed to meet budget constraints and/or add some “nice-to-haves” if the money is available. When all this is done and all goes well, the house starts getting built in earnest.
Leave a Reply