We emptied out most of the master bedroom last night so Jamal could start the installation of the hardwood floor there today. He got all the carpet out and started in on the underlayment. He thinks he could have that mostly installed by the time he goes home tomorrow afternoon. He says it might be little tight, but he will get close enough that he only has to do the cleanup and then start smoothing things out and finishing. Next week he will start on the stairs and the upstairs with an engineered wood product. We are very excited to see how it comes out. He did a great job on the last two remodel floors he did for us.
Leave a Reply