Our contractor, Mark P. came today and got a lot of finish work done. He looked at a couple of issues with the floor, installed the floor vents, and decided to bring the floor guy back for about a half days work. The floor vents are beautiful. In addition, Mark adjusted all the cabinet doors so they were aligned properly, installed all the cabinet door pulls (but not the drawer pulls), installed the remaining under-cabinet LED lights, installed the missing three overhead lights, and installed the replacement oven door for the one that was broken. I will put up pictures of all that other stuff tomorrow.
The really good news, though, is that he has agreed to help us put a gas fireplace in the kitchen/dining room. We came up with a great plan that he says he should be able to complete before the end of the fall so we will have it this winter. We hope he will be able to draw us a plan, but it is not so complicated, so that may not be necessary. At any rate, we think it will be a great addition to what Mark has already done and we appreciate his willingness to come back here because we know it is a major effort for him to do it.