Mark P., our contractor, said there are only a few things missing in this drawing. The microwave will be above the double oven, the range top is not drawn in and a few other details that we have actually already settled. One thing that is cool is that the curve at the bottom of the island is the line the granite will follow. The big challenge now is when we can get started and it depends on resources–ours, Mark’s and his subs. The next thing we we need to figure out is lighting and granite. We have finished with the cabinets (hickory with a pecan stain and handles, not knobs or pulls).
Leave a Reply