"In the world ye shall have tribulation: but be of good cheer; I have overcome the world." –John 16:33

Day: March 14, 2017

Grandpa Milo and the spirit of the law

Grumpy dogWhenever grandpa ran a stop light or forgot to put on his blinker when he changed lanes he said, “I like to follow the spirit of the law. The letter kills.”

We were all pretty skeptical about that, but today we ran into a situation we think might qualify for a Grandpa Milo type approach. I order my prescriptions from the only mail-order place approved by our insurance. They have good prices and represented that after they confirmed my identification and the validity of the prescriptions, most of the time they would just send them. The service has really been pretty good, but they have sent an email every month asking me to call in to confirm new information (or, in most cases, stuff I had already confirmed). The drugs I need are nothing more the benign high blood pressure, high cholesterol medications, nothing heavy at all.

Last month, I was slammed, so Lorena called in for me. They said even though she was my wife, they needed to talk to me. This month, with everything going on, I asked her to tried again.

When she called, a lady told her, “We cannot talk to you, we have to talk to Kenneth.”

She said, “I am Kenneth.”

The lady said, “Mame, are you really Kenneth?”

She said, “I am.”

After a series of fairly intense questions they went ahead and sent her the prescription. I told her afterward she should have acted mad that they did not respect her gender. I think Lorena has that “spirit of the law” thing down pat, but I probably should be ashamed of myself.

Fits and starts and restarts designing the kitchen

Very preliminary kitchen designDrawings have started to arrive from the kitchen designers. As is always the case in these kinds of things, some of the ideas are exactly what we wanted, but there is a disconnect on others. Part of the disconnect is due to not properly communicating what was wanted. Some though are because of our own disconnect with reality. Sometimes it is not possible to do what you want because of lack of budget, a footprint and configuration that will not fit the available space, etc. etc.

This is a very fun process for us. Now that we have been through it a couple of times we know more about what to expect and what is actually possible. One of our big challenges in this pass through the process is that we would really like to kick off the construction in less than three weeks. That means the builder has to have the material available to him post haste. He needs appliances, custom cabinets and local subcontractors on a tight schedule. We hope to have the design in place before the end of the week so we can officially pull the trigger and our contractor, Mark P. can get started.

Powered by WordPress & Theme by Anders Norén