New heaters for the second guest room

Lots of visitorsThe remodel continues at a good pace as we prepare for visitors, lots of visitors. To that end, we have to get the house in to a more operable state at the same time we need to continue work on the remodel. Easier said than done. People will understand a little bit of disorder, but we want to make sure the guest bedrooms work OK–the two goals often working at cross purposes with each other. We decided the number one goal is to have two working guest bedrooms by the weekend, After that, we can go back to painting.

The first guest bedroom is in pretty good shape. It is newly painted with all the furniture it needs. All it needs is a little organization. The bed for the second one is scheduled to arrive sometime today. It needs to be assembled, a couple of tables, a chair, a heater we got from Walmart.com (again, at a significant savings over Amazon), and a lamp or two need to be added. Then that room will be good to go (short term) as soon as the carpet needs to be cleaned.

About Dad

Married Christian man with two children, one in graduate school and one working. Oregonian (family arrived in 1846 along the Applegate Trail). Living and working from home in Washington state. Lived in North Carolina for seven years, Texas several times and South Florida amoung other places–kids graduated from NCSU, LOVE North Carolina and NCSU, Texas and South Florida). Judo Shodan. Graduate of Oregon State University (B.S. Business Administration, Marketing), Oregon Institute of Techonology (A.E. Computer Systems Engineering Technology), University of Texas at El Paso (M.S. Industrial Engineering). Computer Vision Research Consultant. Bilingual English/Spanish.

Leave a Reply

Your email address will not be published.