The floor in the bedroom was all installed yesterday and partially sanded. The finish arrives today and we should be all done with that part by–oops, our floor guy just called in sick. So, now, the floor finishing will start early tomorrow morning and we should have a room or two of upstairs flooring finished tomorrow night.

We currently have all the stuff from the master bedroom stacked around and clogging up the living room, all the stuff in the upstairs guest bedroom and half the stuff from the upstairs balcony/library stacked around and clogging up the bonus room/office. We are sleeping on the hide-a-bed in the library until the floor in the upstairs guest bedroom is complete. Then we will shuffle everything around so they can do the library and then again, one last time, so they can do the bonus room. After that, there is still the stairs between the main floor and upstairs. Jamal tells us he should be done by early next week with all the hiccups happening to slow things down.