Kitchen remodel: Starting on plumbing, gas, and the floor

Roughing in the kitchen plumbingMark kicked off a lot more work today on the kitchen. He found a place to position the propane tank, roughed in the plumbing for the kitchen and got the hardwood floor guy going. Tomorrow, the electrician will start. I think there must be two phases of these things. My sense is that their is additional electrical and plumbing things to do after the cabinets are in and to prepare for the appliances. Mark said the final Swedish finish goes on the floor at the very end so the only thing that happens right now is the installation of the living room floor and the sanding that needs to be done. I am wondering when the window in this photo is removed and replaced with a door.  All that, I think, has to be completed before the cabinets can be installed.

In the meantime, there Wind blows over cedar tree in Centraliawas a wind storm in Centralia that blew over a tree that might or might not (maybe Bob and Gena have an opinion–they sent us the picture) on our property. The trees are dense enough there that probably most of the trees close to our property are somewhat protected.

About Dad

Married Christian man with two children, one in graduate school and one working. Oregonian (family arrived in 1846 along the Applegate Trail). Living and working from home in Washington state. Lived in North Carolina for seven years, Texas several times and South Florida amoung other places--kids graduated from NCSU, LOVE North Carolina and NCSU, Texas and South Florida). Judo Shodan. Graduate of Oregon State University (B.S. Business Administration, Marketing), Oregon Institute of Techonology (A.E. Computer Systems Engineering Technology), University of Texas at El Paso (M.S. Industrial Engineering). Computer Vision Research Consultant. Bilingual English/Spanish.

Leave a Reply

Your email address will not be published.